[1/2] Hywind Tampen floating wind farm structures are being assembled at the Wergeland Base in Gulen, Norway, June 7, 2022.
But by 2035, the LCOE for floating wind is expected to fall to about 60 euros/MWh.
It plans to set a specific target for floating wind this year.
Britain aims to have 5 GW of floating wind installed by 2030 but a report by the UK Floating Wind Offshore Wind Taskforce, said 34 GW could be installed by 2040 if ports were upgraded.
"South Korea will be commercial the quickest," said Cole at Corio Generation, which has 1.5 GW of floating wind under development there.